Why It Is Crucial to Track Production Waste Separately from Consumption
Learn the impact of tracking production waste separately from standard raw material consumption on unit cost accuracy, percentage-based overhead cost bases, and waste reduction decisions.

On this page
The Hidden Cost of Writing "We'll Just Add 10% Waste" in Your Bill of Materials
When calculating costs in small and medium-sized workshops, the most common shortcut is to arbitrarily increase the raw material quantity in the product recipe. For example, if a ceramic mug uses 400 grams of clay, 440 grams is written down, assuming the waste problem is solved. However, this practical approach leads to three serious problems: You never see how much material was actually broken or thrown away in a given batch, yield increases cannot be measured, and percentage-based overhead costs calculated on raw material consumption become artificially inflated.
When you bury waste inside consumption, you cannot distinguish whether the loss stems from craftsman error or supplier material quality. To improve profitability, you must first keep the standard (recipe) clean and measure deviation (waste) separately.
Why Does Qolay.App Use a Separate "Enter Waste" Instead of a Waste Field in the Recipe?
Setting up complex quality approvals or multi-step scrap processes in heavy enterprise systems exhausts small businesses. Pre-accounting platform Qolay.App solves this issue extremely simply in its Production Management add-on module: There is no fixed waste rate field in the recipe. The recipe only holds the ideal components for 1 unit of a sound product.
When production is completed, you open the Production Entry form from the web or iOS/Android mobile app, enter the produced sound quantity, and process the actual loss immediately via the separate Enter Waste window on the exact same screen. Thus, waste is both deducted from stock and added to the total production cost without inflating the consumption line; however, it is strictly excluded from the base of Service–Rate (%) type additional costs.
The second major advantage this distinction offers is comparability. At the end of the month, you clearly see which day produced less waste among different batches manufactured with the same recipe, and which craftsman or raw material purchase reduced the loss. While standard consumption remains constant, the waste column becomes the mirror of operational efficiency.
Numerical Comparison: 100 Handmade Ceramic Mugs Example
Let's assume a ceramic workshop produces 100 units of sound Glazed Ceramic Coffee Mugs, but during firing, 8 mugs crack in the kiln and suffer glaze defects, leading to a loss of 4 kg of clay and 0.5 kg of glaze.
| Cost Item | Record Type | Quantity / Rate | Unit Price | Total Amount |
|---|---|---|---|---|
| Stoneware Ceramic Clay | Raw Material Component | 40 kg (0.40 kg × 100) | 75.00 TL | 3,000.00 TL |
| Matte Cream Glaze | Raw Material Component | 5 kg (0.05 kg × 100) | 400.00 TL | 2,000.00 TL |
| Raw Material Subtotal | % Rate Base | - | - | 5,000.00 TL |
| Stoneware Ceramic Clay | Enter Waste (Separate Record) | 4 kg | 75.00 TL | 300.00 TL |
| Matte Cream Glaze | Enter Waste (Separate Record) | 0.5 kg | 400.00 TL | 200.00 TL |
| Mug Shipping Box and Filler Paper | Additional Cost (Stock) | 100 units (Multiplication Open) | 16.00 TL | 1,600.00 TL |
| Ceramic Kiln Firing Energy | Additional Cost (Service–Rate) | %20 (To Raw Material Only) | - | 1,000.00 TL |
| Glazing and Kiln Stacking Labor | Additional Cost (Service–Amount) | 1 batch (Multiplication Closed) | 900.00 TL | 900.00 TL |
| Grand Total Cost | 5,000 + 500 + 3,500 | 100 units | Unit Cost: | 90.00 TL |
If the 500.00 TL waste had been mixed into the consumption line in the recipe, the 20% firing energy would have been calculated as 1,100.00 TL over 5,500.00 TL instead of 5,000.00 TL, artificially inflating the cost to 100 TL, and clay and glaze loss would have appeared as 0 TL in the year-end Waste Report. Thanks to the separate entry, both the unit cost is precisely found to be 90.00 TL and the actual loss of 500.00 TL is transparently tracked in the report.
How Does Waste Management Work Step-by-Step with Qolay.App?
- 1. Clean Recipe Setup (Production → Recipes): Enter only the raw material genuinely required for a sound unit for each finished product. The system brings the component cost using remaining stock FIFO, or last purchase price if FIFO is unavailable, or a "No cost" warning otherwise.
- 2. "Enter Waste" Window in Production Entry (Production → Production Entries): After entering the 100 mugs that turned out sound on the production form, add the wasted raw material, waste quantity, and optional notes like "cracking on the top shelf of the kiln" through the "Enter Waste" window. Consumption, waste, and Stock-typed items are all deducted from inventory; even if a low stock warning is given, the record is not blocked.
- 3. Waste Report and FIFO Finalization (Production → Reports): The FIFO engine running at night finalizes the final cost. You can view waste details on the Production Slip PDF and customize the template according to your business. With the Waste Report under Reports, you can export all losses up to 366 days (up to 5,000 rows) to Excel to analyze which raw material generates the most waste; you can track your profitability from start to finish with Production Summary, Raw Material Consumption, and Recipe Cost reports featuring the "Show margin" option.
4 Common Mistakes in Waste Management
- Not Recording Waste At All: Deducting only sound product consumption leads to constantly missing raw materials during end-of-month warehouse counts.
- Leaving Waste Without a Description: Leaving the description field in the "Enter Waste" window blank makes it difficult to see whether the problem stems from machine settings or low-quality raw materials.
- Including Cracked Products in the Produced Quantity: Including products that did not turn out sound in the produced quantity creates phantom finished product inventory that cannot be sold on marketplaces.
- Deducting Waste from Cost: Wasted raw material was also purchased with money; it must be added to the total cost and divided only by the number of sound products.
- Overlooking Packaging Waste: Not only primary raw materials, but also boxes and labels that cannot be used due to printing errors or breakage must be accurately tracked as waste or consumption.
Frequently Asked Questions
Does raw material inventory also decrease when a waste entry is made?
Yes. During production entry, recipe consumption, the waste quantity reported via Enter Waste, and Stock-typed additional costs are all deducted from the relevant company warehouse.
Can I correct the waste quantity later if I enter it incorrectly?
Yes. When Admin or Standard authorized users edit or delete a production record, inventory movements are updated automatically.
Why is the waste amount not included in the Service–Rate (%) calculation?
Percentage-based additional expenses are based solely on standard raw material consumption in the recipe. Thus, when an unexpected accident or high waste occurs, percentage expense items do not grow artificially.
How many days of retrospective records can I review with the Waste Report?
You can pull the Waste Report covering a maximum of 366 days and providing data up to 5,000 rows from the Production → Reports screen, and export it as an Excel file with a single click if you wish.
Conclusion: Make Losses Visible, Regain Your Profit
You cannot reduce waste that you cannot measure. Tracking waste separately from consumption both grounds your warehouse inventories in reality and enables you to establish your unit cost accurately. You can establish this discipline in minutes with Qolay.App Production Management. You can also check out our Stock Cost and Valuation article regarding stock valuation.
Open a free account on Qolay.App and start the Production Management module trial from Qolay Market.
This article is for general informational purposes. It is recommended to consult your financial advisor for tax and accounting evaluations of waste rates.
Try it after reading
Start applying what you read with Qolay.App — for free.
Related articles
Other guides close to this topic.

Small-Scale Production Cost Calculation with Bill of Materials (BOM) and Recipes
Automatic Stock Deduction from Raw Material to Finished Product and Unit Cost
Calculate your small-scale production costs with Bill of Materials (BOM) and recipe management, automate raw material stock deductions, and increase your profitability.

Inventory Flow from Production to Marketplaces for E-Commerce Sellers Who Manufacture Their Own Products
Produce in the Workshop, Instantly List on Marketplaces and E-Commerce
Learn how e-commerce sellers who manufacture their own products can manage their inventory flow—from workshop production entry to marketplaces—from a single dashboard.

The Hidden Errors of Production Cost and Bill of Materials Tracking with Excel
The Way Out of Broken Formulas, Outdated Purchase Prices, and Inventory Disconnection
See why production cost and bill of materials tracking done with Excel creates silent errors and how you can establish a flawless inventory-cost workflow with the Qolay.App pre-accounting platform.