Cable, Lampholder, Body, and Assembly Costs in Lighting and Lampshade Workshops
Manage the costs of wooden/metal bodies, shades, E27 lampholders, textile cables, assembly labor, and protective boxes in lighting and lampshade workshops with Qolay.App.

On this page
Missing Stock and Cost Links in Multi-Part Lighting Products
In lighting workshops producing table lamps, floor lamps, sconces, or pendant chandeliers, the essence of the work is multi-part assembly. To complete a single lampshade, turned wood or painted metal bodies, fabric-covered wire frame shades, E27 lamp holders, switch-equipped textile cables, locking nuts, and testing equipment come together. Each of these parts arrives from different suppliers and at different times.
The biggest operational hitch in the field is this: While bodies and shades are counted, waste from stripping meter-long cables, lamp holders found defective during testing, assembly labor, and special corrugated boxes protecting bulky lampshade heads from crushing during shipping are often left out of the costs. As a result, it is only realized later that a lamp model appearing to have a high turnover on the marketplace actually yields a low profit.
Why a Simple Assembly Recipe Instead of Heavy ERP and MRP?
ERP and MRP software built for major white goods or industrial fixture factories bring unnecessary overhead to boutique decorative lighting workshops. The workshop team does not need to define separate station steps for each assembly table; what matters is that all parts are fully deducted from stock and the true unit cost is revealed after assembly.
Qolay.App is a pre-accounting platform. The web and iOS/Android mobile applications operate with the same streamlined Production Management screens. If you produce the wooden body on your own lathe, you first produce the body as a semi-finished product and add it to stock; if you buy it ready-made, you add it directly as a component to the lampshade recipe. When assembly is complete, you make a Production Entry in a single form, and your e-commerce stock synchronization automatically reflects the new lampshade stock.
Realistic Scenario: 25 Units of Wooden Table Lamps with Fabric Shades
Let's assume the assembly of 25 Wooden Table Lamps with Fabric Shades has been completed as a collection batch in the workshop. During assembly, 4 meters of textile cable left over from cutting/stripping and 2 defective lamp holders found during testing were recorded via the Enter Waste window:
| Cost Item (For 25 Lamps) | Record Type | Quantity / Calculation | Amount (TL) |
|---|---|---|---|
| Turned Beech Wood Body | Component | 25 × 1 unit = 25 units × 220 TL | 5,500.00 TL |
| Linen Lampshade (With Wire Frame) | Component | 25 × 1 unit = 25 units × 160 TL | 4,000.00 TL |
| Braided Textile Cable (With Switch + Plug) | Component | 25 × 2.00 m = 50.00 m × 30 TL | 1,500.00 TL |
| E27 Brass Lamp Holder & Nut Set | Component | 25 × 1 unit = 25 units × 40 TL | 1,000.00 TL |
| Raw Material Total | Subtotal | 5,500 + 4,000 + 1,500 + 1,000 | 12,000.00 TL |
| Workshop Electricity & Testing Equipment Share | Additional Cost (Service–Rate) | Raw material only (12,000 TL) × 5% | 600.00 TL |
| Electrical Connection & Assembly Labor | Additional Cost (Service–Amount) | Fixed per batch (multiply closed) | 1,500.00 TL |
| Corrugated Shipping Box + Bubble Wrap | Additional Cost (Stock) | 25 units × 36 TL (multiply open) | 900.00 TL |
| Cable Cutting Waste (Waste 1) | Enter Waste | 4.00 m × 30 TL (not included in 5% base) | 120.00 TL |
| Defective Lamp Holder in Test (Waste 2) | Enter Waste | 2 units × 40 TL (not included in 5% base) | 80.00 TL |
| Total Production Cost | Grand Total | 12,000 + 200 + (600 + 1,500 + 900) | 15,200.00 TL |
| Unit Lampshade Cost | 25 Sound Units | 15,200.00 ÷ 25 | 608.00 TL / unit |
While main parts amount to 480 TL per unit; when adding the 5% workshop share (600 TL), assembly labor (1,500 TL), sturdy shipping box (900 TL), and 200 TL of cable-holder waste, the actual unit cost of the lamp comes to 608.00 TL.
Step-by-Step Setup in the Lighting Workshop with Qolay.App
- 1. Create the Recipe (Production → Recipes): Add the body, shade, holder, and cable to the Components tab for each lighting model. Since cable rolls are purchased and consumed in meters, unit consistency is fully maintained.
- 2. Add Assembly Labor and Large Shipping Box: Define the assembly master cost as Service–Amount (multiply closed), and the shipping box and protective nylon as Stock (multiply open).
- 3. Post-Assembly Production and Waste Entry (Production → Production Entries): Make the production entry when 25 lamps are tested and boxed; deduct the remaining piece from the cable end and the defective holder via the Enter Waste window.
- 4. Check Marketplace Stock and Reports (Production → Reports): When production is recorded, finished goods stock is updated and automatically transferred to your e-commerce channels. You can instantly view your profitability with the "Show margin" option in the Recipe Cost report.
5 Common Cost Mistakes in Lighting Workshops
- Not Counting Terminal Blocks, Nuts, and Cable Ties: When small electrical connection elements run out, the assembly table stops; they must be added to the component list.
- Not Including the Large Shipping Box in the Cost for Lampshades: Custom-sized corrugated boxes are used for bulky shades and account for a significant share of the unit cost.
- Trying to Buy Cable Rolls by the "Spool" and Consume by the "Meter": Since there is no unit conversion in v1, you need to process a 100-meter roll as 100 meters on the invoice.
- Writing Interior Designers' Special Long Cable Requests into the Main Recipe: If a one-off 4-meter cable or special bulb is added, it is sufficient to edit this only within that specific production entry.
- Leaving the Multiply Option Incorrect in Assembly Labor: For 1,500 TL of batch labor, "Multiply by production quantity" should be disabled; otherwise, 37,500 TL of labor will be written for 25 units.
Frequently Asked Questions
How do I enter the fabric shade if I outsource it or cover it in my own workshop?
If you buy ready-made shades from outside, you stock them directly via the purchase invoice and make them a component. If you produce them in your own workshop from a wire frame and linen fabric, you first produce the "Linen Lampshade" semi-finished product and then use it in the table lamp recipe.
How do I track the bulb if I only put it in the box for certain orders?
You can set up the recipe without the bulb and add the bulb row as a Stock-type additional cost during the Production Entry for batches where a bulb is included; the main recipe remains intact.
Can I give the Production Slip PDF output to the assembly team?
Yes. You can get a customizable Production Slip PDF document from every production record and keep it in the team file or accounting.
Do parts found defective or broken during testing affect my marketplace stock?
Defective holders and cable scraps are deducted from raw material stock using Enter Waste; the produced 25 sound lamps enter finished goods stock and directly reflect on your e-commerce stock transfer.
Give Every Part and Every Assembly Its Due
You can protect your true profit in lighting and lampshade workshops by combining dozens of small electrical parts, labor, and shipping protection on a single screen. For details, you can review the Qolay.App Production Management page; you can also check out our articles on Profile Cost Calculation in Metal and Welding Workshops and Stock Synchronization in E-Commerce. The Production Management module is offered as a separate add-on in Qolay Market with a free trial available. Take control of your assembly costs immediately by opening a free account on Qolay.App.
This article is for general informational purposes. Consult experts and your financial advisor for details on CE/TSE standards and tax legislation regarding lighting products.
Try it after reading
Start applying what you read with Qolay.App — for free.
Related articles
Other guides close to this topic.

Seasonal Milk Price and Cost Tracking for Ice Cream and Dairy Dessert Manufacturers
Real-Time Monitoring of Milk Price Hikes, Boiling Loss, and Packaging Costs
Learn how to cost seasonal milk price hikes, pasteurization losses, and packaging containers with simple recipes in ice cream and dairy dessert production facilities.

Qolay.App Production Management: Recipes and Costs in 3 Steps for Small Manufacturers
Simple Recipes, Production Entry, and Reporting for Workshops, Cafes, and E-Commerce Manufacturers
Learn how to create recipes, enter production data, track waste, and analyze unit costs in three steps with the Qolay.App Production Management module, developed for small and medium-sized businesses.